Facilitated the Supply of 4Nos 60MVA 132/33kV Pauwel Make Power Transformers through CG to LagaCE Power from
Indonesia factory which were already commissioned and presently performing well |
Transmission Company of Nigeria /Power Holding Company of Nigeria |
Lagos |
2012 |
Completed |
2 |
Facilitated the supply of 4Nos. 60MVA 132/33kV Paulwel Make Power Transformers to BRAN/Ashtavinayaka for the
construction of substations in Nigera not yet commissioned but the project on-going. |
Transmission Company of Nigeria /Power Holding Company of Nigeria |
Nigeria |
2013 |
Supplied Completed |
3 |
Supply of Electrical materials for replacement of failed ones at 2x15MVA injection Substation |
Abuja Electricity Distribution Company (AEDC) |
Shendam Lafia |
October, 2016 |
Supplied |
4 |
Supply of 7.5MVA/33/11kV, 50HZ Power Transformer |
Omarcwhite/Embreins Engineering Consulting Ltd |
Kontagora township Niger State |
April, 2017 |
Supplied |
5 |
Supply of 33Kv SF6 Circuit Breaker (Outdoor) |
Omarcwhite/Embreins Engineering Consulting Ltd |
Kontagora township Niger State |
April, 2017 |
Supplied |
6 |
Supply of Instrument Transformer |
Omarcwhite/Embreins Engineering Consulting Ltd |
Kontagora township Niger State |
April, 2017 |
Supplied |
7 |
Electricity connection to wewood industry from Omotosho Power Plant Switchyard |
Transmission Company of Nigeria (TCN) |
Omotosho, Ondo State |
April, 2017 |
Ongiong |
8 |
Erection of 1x30MVA, 132/33Kv power transformer at Suleja, Bauchi and Kastina 132/33Kv TS |
News Engineering |
Suleja, Bauchi and Kastina 132/33Kv TS |
2005-2006 |
Completed |
9 |
Construction of Equipment foundations and Electromechanical equipment erection at Akure 132/33Kv TS |
Elephant Nig Ltd |
Akure, Ondo State |
2007 |
Completed |
10 |
Design, Engineering and Drawing of 2x3/40MVA 132/33 S/S at Ogoja |
Income Electric |
Ogoja, Cross River |
2009 |
Completed |
11 |
Promotion and supply of CG make HV Equipment in Nigeria to EPC Contractors/TCN,Distribution and Generation
companies |
CG Power and Industrial Solution Limited |
Nigeria Office |
Since 2003 till date |
Ongoing |
12 |
Construction of solar inverter to Power Borehole |
Naomi pure bottle water( Nig ) Ltd |
Mararaba, Karu Nasarawa State |
February, 2016 |
Completed |
13 |
Award Of Emergency Design, Supply And Installation Of Protective/Control And Tariff Equipment At Alscon Ibom
Power Plant |
Mojec International |
Alscon Ibom |
June 2017 |
On-going |
14 |
Supply of Switchgear for Transmission Company of Nigeria- Project Management Unit (TCN-PMU) NGP-T9 Lot1 |
CG Power and Industrial Solutions Limited/Legeng Engineering (Nigeria) Limited |
Ojo Lagos |
October 2018 |
Completed |
15 |
Supply of Bulk gap conductors and circuit breakers for Transmission Company of Nigeria (TCN-PMU) Contract No.
NGP-T10 Lot2 |
CG Power and Industrial Solutions Limited/Legeng Engineering (Nigeria) Limited |
Ojo Lagos |
December 2018 |
Completed |
16 |
Supply of 9nos 330Kv Circuit Breakers for Transmission Company of Nigeria |
CG Power and Industrial Solutions Limited/Legeng Engineering (Nigeria) Limited |
Ojo- Lagos |
May 2018 |
Completed |
17 |
Supply of 10nos 132Kv Circuit Breakers for Transmission Company of Nigeria |
CG Power and Industrial Solutions Limited/Legeng Engineering (Nigeria) Limited |
Ojo- Lagos |
March 2018 |
On-going |
18 |
Supply of 50nos 33Kv Circuit Breakers for Transmission Company of Nigeria |
CG Power and Industrial Solutions Limited/Legeng Engineering (Nigeria) Limited |
Ojo- Lagos |
May 2018 |
Completed |
19 |
Construction of 2x 30/40MVA Transformer Substation |
Stedy Engineering & Construction Limited |
Okitipupa |
December 2017 |
0n-going |
20 |
NDPHC PHC Distribution Zone, Lot 41, AHOADA 33/11KV, 15MVA Injection Substation |
|
|
|
Completed |
21 |
Supply of 10Nos 330kV Circuit Breakers and 40Nos 132kV Isolators for TCN |
Transmission Company of Nigeria TCN |
Ojo- Lagos |
March, 2021 |
On-going |